Equipment for data centres.

Servers, storage and networking for data centres and enterprise IT sites. We help align the order scope, documents and international supply through to receipt at your site.

Discuss equipment supply
Illustration of data-centre equipment: a server rack, rack-mount server and network switch
Equipment illustration, not a stock catalogueServers · Storage · Networking

Compute. Storage. Connectivity.

Servers, storage and networking need to serve one requirement. We connect your IT team's specifications, supplier proposals and international supply arrangements.

  • Servers

    Compute nodes for applications, virtualisation and data workloads.

    Configuration · Included items · Expansion
  • Storage systems

    Equipment for data storage and backup requirements.

    Drives · Controllers · Connectivity
  • Networking

    Switches and equipment connecting compute, storage and external networks.

    Ports · Optics · Licences

Where we can help

  • Prepare equipment supply for a new server room or data centre.
  • Expand compute capacity, storage or networking at an existing site.
  • Bring items from several suppliers into an agreed delivery plan.

Agreed before ordering

  • Exact models, configurations, equipment condition and permitted substitutions.
  • Availability, provenance, warranty and service terms for each item.
  • Supply feasibility for the destination, documentation, pricing and timing.

The model matters. So does everything that comes with it.

The same model name can cover different configurations. We compare the proposed scope with your request and flag details the supplier still needs to confirm.

Illustration of a server room with storage systems and network switches in racks
Illustration, not a client facilityA precise configuration comes before an order.

Check the core device together with its connections, accessories and support arrangements before ordering.

  1. Model and configuration

    Part numbers, processors, memory, drives, network interfaces and device quantities. If there is no list yet, start with the requirement.

  2. Mounting and connections

    Rails, mounting hardware, power supplies, cables and optical modules. Identify what is included and what must be ordered separately.

  3. Licences and support

    Software licences, support duration and territory, and warranty procedures. These are not assumed to be included.

  4. Packing and identification

    Equipment condition, packaging, labels and serial-number lists where available. Agree how completeness will be recorded before handover.

  5. Receiving site and date

    Address, recipient contact, delivery window, unloading access and storage readiness. Agree the sequence if equipment arrives in stages.

One specification connects every stage.

Each step uses agreed information. Changes to a model, scope or date go back for approval.

  1. Review the request

    Start with an equipment list or your IT team's requirement. Identify essential parameters and acceptable alternatives.

    A comparable supplier request
  2. Check the proposal

    Clarify configuration, availability, included items and support. Your IT team or a qualified specialist confirms technical decisions.

    Order scope and open questions
  3. Prepare the supply

    Coordinate documents, packing, dispatch readiness and transport. Align dates and handovers across suppliers.

    Dispatch and handover plan
  4. Coordinate receipt

    Agree how quantities, labels and visible condition will be checked. Installation, configuration and commissioning are discussed separately.

    An agreed receiving procedure
Work outputs

What you will have to work with

Materials are prepared within the agreed scope of work to support decisions and make the current project status clear.

  1. Equipment scope

    An agreed list of models, configurations, quantities and accessories, with substitutions identified.

  2. Supply arrangements

    Equipment readiness, packing, route and handover arrangements.

  3. Document checklist

    A commercial and packing document checklist, with labelling and serial-number information within the agreed scope.

  4. Receiving plan

    Milestone dates, participant contacts and a procedure for recording discrepancies on receipt.

Which materials does your project need?

Discuss a project

Questions about IT equipment supply

Can we start without a complete specification?

Yes. Describe the intended use, existing infrastructure and desired outcome. We help collect questions for suppliers. Your IT team or integrator confirms resource sizing and the final configuration.

Can we request a particular model or brand?

Yes. Share the model, part number and configuration. Supply feasibility, condition, provenance, timing and support are reviewed on request. This page does not claim stock of a particular brand or authorised dealer status.

What if a supplier proposes an alternative?

First compare configuration, interfaces, included items and service terms. A substitution is not approved automatically: the client confirms it after technical review.

Do you install and commission the equipment?

This page covers supply preparation and coordination. Installation, connections, configuration, migration and commissioning are discussed separately, with an agreed provider and responsibilities.

What does your IT infrastructure need?

Share a specification or describe the requirement, destination country and preferred timing. An existing supplier proposal is enough to start.

Discuss equipment supply